Submit an Article
Become a reviewer
Vol 64 Iss. 1
Pages:
89-95
Download volume:
RUS
Article

Calculation of metal four-jointed arched compliant support

Authors:
V. V. Smirnyakov
Date submitted:
1973-07-02
Date accepted:
1973-09-08
Date published:
1974-01-01

Abstract

A four-hinged brace is a statically defined geometrically variable system with one degree of freedom. In ground structures, geometrically variable systems are almost never used due to their instability. Therefore, the construction mechanics does not provide a specific methodology for their calculation.

Область исследования:
(Archived) Without section
Go to volume 64

References

  1. Geleskul M.N., Kiselev E.S. Design and calculation of reinforced concrete frame supports. Gosgortekhizdat, 1961.
  2. Davydov S.S. Calculation and Design of Underground Structures. Stroyizdat, 1950.
  3. Instruction on the use of metal arch pliable fasteners of constant resistance in preparatory excavations of coal mines. PH A.A. Skochinsky IHD, 1971.
  4. Nasonov L.N. Mechanics of Rocks and Fastening of Mine Workings. Nedra, 1969.
  5. Smirnyakov V.V., Mirzaev G.G. Metal fasteners with new knots of pliability. Mining Journal. 1963, No. 9.
  6. Smirnyakov V.V., Mirzaev G.G., Bokiy V.B. Experience of application of arch bracing from special profile with new pliability nodes. In the collection: Modern Issues of Mine Construction, PH LMI, 1971.

Similar articles

Estimation of strength of horizontal excavations sides by condition of detachment of rock mass near the contour zones
1974 M. M. Mordukhovich
Determination of the stressed state of rock massif around a field excavation influenced by cleaning works
1974 A. G. Protosenya
Methods of observation of the effect of mass explosions on the stability of mine workings
1974 G. G. Mirzaev, V. I. Vikharev, V. Ya. Bril
Mechanics of decoupling and flow of rock outbursts
1974 K. K. Samokhvalov
Dependence of strength of layered material on adhesion and friction at contacts of layers
1974 O. V. Timofeev, R. E. Dashko, N. S. Konokotov
The Department of Construction of Mining Enterprises of the LMI is 25 years old
1974 B. V. Bokii