Determination of the rock filtrationcoefficient in the massif during regulated water release from flooded workings
Abstract
From flooded workings, a regulated release of water with a large hydrostatic head can be ensured by reliably determining the size of the pillar left between the flooded working and the face of the crosscut, along which the water is planned to be discharged. To calculate the size of the pillar, it is necessary to know the compressive strength of rocks, which is usually determined on samples at natural moisture content.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Approximate analytical determination of the dimensions of the inelastic deformation zone around mine workings
1974 A. G. Protosenya, V. A. Vashilin
Determination of the stress state of the rock mass around a development roadway influenced by mining operations
1974 A. G. Protosenya
The role of the St. Petersburg Mining Institute in the development of coal industry of the Donetsk basin in the pre-revolutionary period
1974 B. V. Bokii