Submit an Article
Become a reviewer
Vol 64 Iss. 1
Pages:
102-107
Download volume:
RUS
Article

Determination of rock filtration coefficient in the massif at regulated water release from flooded excavations

Authors:
V. B. Bokiy
A. M. Fridlyand
A. I. Gololobov
A. I. Kudryashov
Date submitted:
1973-07-04
Date accepted:
1973-09-04
Date published:
1974-01-01

Abstract

From flooded mine workings the regulated descent of water with a large hydrostatic head can be ensured at reliable determination of the size of the target left between the flooded mine workings and the face of the slipway, through which the water is planned to be discharged. To calculate the size of the pillar it is necessary to know the compressive strength of rocks, which is usually determined by samples at natural moisture.

Область исследования:
(Archived) Without section
Go to volume 64

Similar articles

Investigation of relaxation properties of silty sandstone and salt rocks
1974 Yu. F. Kuznetsov, V. S. Livensky
Estimation of strength of horizontal excavations sides by condition of detachment of rock mass near the contour zones
1974 M. M. Mordukhovich
Rational form of metal support for preparatory excavations
1974 V. V. Smirnyakov
Dependence of strength of layered material on adhesion and friction at contacts of layers
1974 O. V. Timofeev, R. E. Dashko, N. S. Konokotov
Calculation of natural tension of fastening rods due to rock creep
1974 O. V. Timofeev
The role of St. Petersburg Mining Institute in the development of coal industry of Donetsk basin in the pre-revolutionary period
1974 B. V. Bokii