Determination of the rock filtrationcoefficient in the massif during regulated water release from flooded workings

Authors:
V. B. Bokiy
A. M. Fridlyand
A. I. Gololobov
A. I. Kudryashov
Date submitted:
1973-07-04
Date accepted:
1973-09-04
Date published:
1974-01-01

Abstract

From flooded workings, a regulated release of water with a large hydrostatic head can be ensured by reliably determining the size of the pillar left between the flooded working and the face of the crosscut, along which the water is planned to be discharged. To calculate the size of the pillar, it is necessary to know the compressive strength of rocks, which is usually determined on samples at natural moisture content.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 64

Similar articles

Photoelastic study of the influence of irregularities in the rock contour of horizontal workings on the stress state of the near-contour zone of the rock mass
1974 E. A. Zimina, E. N. Tarasenko
Determination of the stress state of the rock mass around a development roadway influenced by mining operations
1974 A. G. Protosenya
Stability of a ring and a circular arch under symmetrical unevenly non-uniformly distributed loading
1974 Yu. S. Obruchev
The Department of Construction of Mining Enterprises of the LMI celebrates its 25th anniversary.
1974 B. V. Bokii
Calculation of the natural tension of rock bolts due to rock creep
1974 O. V. Timofeev
Rational shape of metal support for development workings
1974 V. V. Smirnyakov