Determination of rock filtration coefficient in the massif at regulated water release from flooded excavations

Authors:
V. B. Bokiy
A. M. Fridlyand
A. I. Gololobov
A. I. Kudryashov
Date submitted:
1973-07-04
Date accepted:
1973-09-04
Date published:
1974-01-01

Abstract

From flooded mine workings the regulated descent of water with a large hydrostatic head can be ensured at reliable determination of the size of the target left between the flooded mine workings and the face of the slipway, through which the water is planned to be discharged. To calculate the size of the pillar it is necessary to know the compressive strength of rocks, which is usually determined by samples at natural moisture.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 64

Similar articles

The Department of Construction of Mining Enterprises of the LMI is 25 years old
1974 B. V. Bokii
Dependence of strength of layered material on adhesion and friction at contacts of layers
1974 O. V. Timofeev, R. E. Dashko, N. S. Konokotov
Calculation of metal four-jointed arched compliant support
1974 V. V. Smirnyakov
Stability of a ring and a circular arch under symmetrical unevenly distributed load
1974 Yu. S. Obruchev
Estimation of strength of horizontal excavations sides by condition of detachment of rock mass near the contour zones
1974 M. M. Mordukhovich
Estimation of structural weakening of rocks
1974 Yu. S. Obruchev, N. S. Konokotov