Submit an Article
Become a reviewer
Vol 64 Iss. 1
Pages:
102-107
Download volume:
RUS
Article

Determination of rock filtration coefficient in the massif at regulated water release from flooded excavations

Authors:
V. B. Bokiy
A. M. Fridlyand
A. I. Gololobov
A. I. Kudryashov
Date submitted:
1973-07-04
Date accepted:
1973-09-04
Date published:
1974-01-01

Abstract

From flooded mine workings the regulated descent of water with a large hydrostatic head can be ensured at reliable determination of the size of the target left between the flooded mine workings and the face of the slipway, through which the water is planned to be discharged. To calculate the size of the pillar it is necessary to know the compressive strength of rocks, which is usually determined by samples at natural moisture.

Область исследования:
(Archived) Without section
Go to volume 64

Similar articles

Approximate analytical determination of the dimensions of the inelastic deformation zone around the mine workings
1974 A. G. Protosenya, V. A. Vashilin
Rational form of metal support for preparatory excavations
1974 V. V. Smirnyakov
Estimation of structural weakening of rocks
1974 Yu. S. Obruchev, N. S. Konokotov
Methods of observation of the effect of mass explosions on the stability of mine workings
1974 G. G. Mirzaev, V. I. Vikharev, V. Ya. Bril
Calculation of metal four-jointed arched compliant support
1974 V. V. Smirnyakov
Investigation of relaxation properties of silty sandstone and salt rocks
1974 Yu. F. Kuznetsov, V. S. Livensky