Basics of the method of optimization of the parameters of the floor forced caving system
Authors:
About authors
- Ph.D., Dr.Sci. Leningrad Mining Institute
Abstract
The system of floor forced caving is widely used in the development of powerful, vast deposits. Representing a complex complex of mutually influencing and conditioning each other parameters and processes, in their compliance with mining geological and mining conditions, this system provides high labor productivity and low cost of ore extraction. ...
Область исследования:
(Archived) Without section
References
- Gushchin V.V. et al. Improvement of the system of underground mining. Murmansk book publishing house, 1965.
- Dubynin N.G., Khramtsov V.F. Ore release management in underground mining. PH IME, SB AS USSR, 1970.
- Kurnosov A.M. General Principles of Economic and Mathematical Modeling in Solving Design Problems. PH IME, 1966.
- Kurnosov A.M. et al. Choice of the way of preparation of a mine field with the help of electronic-computing machines. Nedra, 1969.
- Ryabchenko E.P., Tregubov B.E. Determination of rational parameters of drilling and blasting works with application of electronic computer machine. Chermetinformatsiya, ser. 2, 1966, No. 6.
- Ustinov M.I., Nabrodov I.P. Algorithmization and programming of optimization tasks of parameters of coal mines. Nedra, 1971.