On an efficient method of automatic unloading of bulk material from a multi-section hopper in averaging mode
Authors:
Abstract
Various methods of unloading ore from multi‑section hoppers provide opportunities for stabilizing the quality of the ore. The described scheme is characterized by high reliability and ease of operation, and can be used for ore blending at various mining industry enterprises.
Область исследования:
(Archived) Without section
Funding:
None
References
- Azbel E. I. Mathematical model of the ore averaging process under stepped loading of a bin. Sb.: Sistemy i sredstva avtomaticheskogo upravleniya I Kiev, Izd. In-ta avtomatiki , 1970 (in Russian)
- Panchishkin A. P., Azbel E. I. On effective methods of bin unloading in averaging mode. Sb.: Novye issledovaniya v gornoi elektromekhanike . Izd. LGI , 1971 (in Russian)
- Shkolnikov A. D., Azbel E. I. Averaging of the qualitative composition of ores in bins of beneficiation plants. Fiziko-tekhnicheskie problemy razrabotki poleznykh iskopaemykh Novosibirsk, 1970, No. 5 (in Russian)
Similar articles
On the use of a thermistor in the compensation circuit of an F-meter type moisture meter
1975 E. S. Krichevsky, V. P. Terekhov, S. S. Galushkin
Increasing Improving the reliability of discrete information transmission in the ACS
1975 M. I. Khanukaev
Method for minimizing the errors of a capacitive self-compensating moisture meter
1975 E. S. Krichevsky, R. M. Proskuryakov