Submit an Article
Become a reviewer
Vol 68 Iss. 2
Pages:
92-93
Download volume:
RUS
Article

Main tasks of production sampling at the Kovdorsky phlogopite deposit

Authors:
Yu. N. Tarasenko
Date submitted:
1974-08-23
Date accepted:
1974-10-30
Date published:
1975-02-01

Abstract

As is known, phlogopite is used mainly for the production of pinched mica, which is used for the manufacture of various electrical insulating glued products (micalent, micanite, etc.). ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 68

Similar articles

Theoretical bases of carbonatometric method of prospecting for Iceland spar deposits
1975 A. V. Skropyshev
Influence of sampling error on the value of correlation coefficient between geological and industrial parameters
1975 G. S. Porotov
Regularities of the initial stage of coal formation
1975 V. V. Kiryukov
About elimination of crystal defects
1975 A. V. Skropyshev
Geological and industrial classification of refractory clay deposits of the Borovichi-Lyubytinsk area
1975 N. A. Ageeva
Thermal metamorphism of coal-bearing strata
1975 O. I. Gavrilova, A. B. Gurevich, S. A. Toporets