Experience of industrial operation of CPC in 6 kV distribution networks of potash mines

Authors:
O. V. Ivanov
B. P. Konovalov
M. M. Malyushitsky
V. D. Ryzhkov
Date submitted:
1978-08-23
Date accepted:
1978-10-09
Date published:
1979-02-01

Abstract

The low quality of voltage in the centers of supply of loads of mining sites during normal operation of the distribution network required regime measures to improve it ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 84

Similar articles

Automated mine electric locomotive
1979 B. G. Aniskin
Methodology of calculation of modes of CPC with thyristor arrester at short circuits in distribution networks 6 kV
1979 O. V. Ivanov, S. A. Maksimov, E. M. Proskuryakov
Criteria of mine electric locomotive control during train moving from a place
1979 V. N. Kordakov
Peculiarities of longitudinal and transverse compensation of voltage and reactive power losses in mine distribution networks
1979 V. M. Kvyatkovsky, E. M. Proskuryakov, L. N. Smirnova, Ya. E. Shklyarsky
Calculation of mine traction substations with pulse thyristor converters
1979 E. V. Bannikov, V. P. Stepanenko, L. A. Chubarov
Laboratory installation for reactive power regulation
1979 N. V. Nefedova