Development of a two-species structure of the repair cycle of the equipment of mica mines

Authors:
E. L. Korotkikh
L. V. Shevelev
A. V. Antia
Date submitted:
1980-10-02
Date accepted:
1980-12-30
Date published:
1981-07-09

Abstract

The analysis of the organization of repair work at mica mines shows that preventive maintenance of technological, lifting and transport, electrical, heat and power and other equipment is carried out both by two- and three-species structure, using in the cycle of average repair ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 87

References

  1. Borisov Yu.S. Organization of repair and maintenance of equipment. M., Mashinostroenie, 1978.
  2. Instruction on the planned preventive repair of construction machines No. SN 207-68. M., PH of Literature on Construction, 1969.
  3. Regulations on planned preventive repair and operation of equipment of enterprises of building materials industry. M., Stroyizdat, 1970. Iss. 11. Industry of non-metallic materials.

Similar articles

Speed limiter for driven radial turbo motors of mining machines
1981 B. S. Makhovikov, S. G. Zaritsky
Combined displacement of the producing contour as a reserve of strength of gears of mining machines
1981 I. P. Ivanov
Bench post-repair tests of mining narrow-capture combines
1981 A. G. Andreev
Analysis of the nature of loads of shearers
1981 V. V. Gabov, V. P. Okolokulak
Application of mathematical methods at planning of preventive maintenance of mining machines
1981 A. I. Talko, O. A. Kaznacheev
Complex work on quality assessment of overhaul repair of mining combines in Kuzbass
1981 V. Yu. Nenarokomov