Submit an Article
Become a reviewer
Vol 87
Pages:
24-26
Download volume:
RUS
Article

Complex work on quality assessment of overhaul repair of mining combines in Kuzbass

Authors:
V. Yu. Nenarokomov
Date submitted:
1980-10-05
Date accepted:
1980-12-01
Date published:
1981-07-09

Abstract

Cleaning (KSH-1KG, KSH-ZM) and tunneling (PK-ZR, 4PU, PK) combines used in the production associations Kuzbassugol and Leninskugol are undergoing overhaul at the ore repair plant Krasny Oktyabr (Leninsk-Kuznetskiy) ...

Область исследования:
(Archived) Without section
Go to volume 87

Similar articles

Investigation of efficiency of manual drilling machines application at mining and engineering enterprises
1981 A. P. Batalov, Yu. P. Boytsov, N. P. Grachev, I. A. Efimov
Processing of oscillograms of KSh-1KG shearers loading
1981 E. V. Anikin, M. D. Kolomiytsov
Application of mathematical methods at planning of preventive maintenance of mining machines
1981 A. I. Talko, O. A. Kaznacheev
Unsteady flow in the hydraulic drive system at braking of a piston with inertial load
1981 K. G. Asatur, G. M. Egorov, S. G. Zaritsky, A. S. Smorodin
Analysis of the nature of loads of shearers
1981 V. V. Gabov, V. P. Okolokulak
Mechanics of filling sectionalized hoppers of enrichment plants under automatic loading control
1981 V. A. Pakhmutov