Submit an Article
Become a reviewer
Vol 87
Pages:
24-26
Download volume:
RUS
Article

Complex work on quality assessment of overhaul repair of mining combines in Kuzbass

Authors:
V. Yu. Nenarokomov
Date submitted:
1980-10-05
Date accepted:
1980-12-01
Date published:
1981-07-09

Abstract

Cleaning (KSH-1KG, KSH-ZM) and tunneling (PK-ZR, 4PU, PK) combines used in the production associations Kuzbassugol and Leninskugol are undergoing overhaul at the ore repair plant Krasny Oktyabr (Leninsk-Kuznetskiy) ...

Область исследования:
(Archived) Without section
Go to volume 87

Similar articles

Investigation of efficiency of manual drilling machines application at mining and engineering enterprises
1981 A. P. Batalov, Yu. P. Boytsov, N. P. Grachev, I. A. Efimov
Load control device at bench tests of combines
1981 V. V. Gabov, Yu. S. Nikitin
A method for predicting the operating time of shearers
1981 M. D. Kolomiytsov
Improvement of systems of preventive maintenance of equipment
1981 E. L. Korotkikh
Dynamic and mathematical models of lever traction mechanism
1981 V. P. Vasiliev
Unsteady flow in the hydraulic drive system at braking of a piston with inertial load
1981 K. G. Asatur, G. M. Egorov, S. G. Zaritsky, A. S. Smorodin