Submit an Article
Become a reviewer
Vol 88
Pages:
120
Download volume:
RUS
Article

Determination of mining equipment reserve value

Authors:
B. S. Borsch
Date submitted:
1980-11-18
Date accepted:
1981-01-13
Date published:
1981-05-28

Abstract

One of the ways to ensure the fulfillment of the planned task by the mining enterprise is general redundancy, in which there is some unloaded reserve of machines, replenishing the fleet of operating ones when they fail before the scheduled repair ...

Область исследования:
(Archived) Without section
Go to volume 88

Similar articles

Built-in device for accounting of BelAZ-549 dump truck operation in static and dynamic modes
1981 V. A. Gardzish, M. A. Semenov
Methodology of prediction of pulp conveyor wear
1981 V. N. Pokrovskaya, L. G. Gambaryan, E. V. Sergeev
Classification of systems of quarry motor transport and mathematical model of their optimization
1981 A. A. Kuleshov
Calculation of spiral-chain type traction device
1981 N. B. Boytsov, A. B. Nezametdinov
Study of load characteristics of electromechanical transmission of heavy-duty dump trucks
1981 A. A. Kuleshov, O. D. Serebrennikov, Yu. A. Plotov
Influence of surface-active substances on energy characteristics of hydraulic transportation
1981 E. V. Sergeev