Optimization of planning of mining tunneling equipment use
Authors:
About authors
- Краковская горно-металлургическая академия им.С.Сташика (ПНР)
Abstract
The Institute of Mine Design and Construction of the S. Staszyk Academy of Mining and Metallurgy in Krakow has developed a method of rational planning of mining tunneling operations using roadheaders ...
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Composition and functional structure of means of production in the conditions of scientific and technical revolution
1981 V. L. Protopopov
Ways of improving the planning of the degree of raw material utilization at the enterprises of non-ferrous metallurgy
1981 S. P. Tsyrkin
Improvement of intraproduction economic calculation in production associations of the coal industry
1981 V. A. Mitrofanov