Submit an Article
Become a reviewer
Vol 93
Pages:
40
Download volume:
RUS
Article

Calculation methodology of drill pipe threaded joints in exploration drilling

Authors:
I. G. Shelkovnikov
Date submitted:
1981-09-10
Date accepted:
1981-11-09
Date published:
1982-10-29

Abstract

Currently, when drilling exploration wells for solid minerals are used drill pipe industry standard CH4I-I-68 nipple and socket-lock connection, as well as pipes for drilling shells with removable core collectors SSC-45 and SSC-59, connecting "pipe to pipe", developed by the All-Union Scientific Research Institute of Methods and Techniques of Exploration (VITR) ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 93

References

  1. Belyaev N.M. Resistance of Materials. M., State PH of Technical Literature, 1953.
  2. Details of machines. M., Mashgiz, 1953. Book I.
  3. Lachinyan L.A., Ugarov S.A. Design, Calculation and Operation of Drilling Exploration Pipes and Their Connections. M., Nedra, 1975.
  4. Mocherniuk D.Y. Research and calculation of threaded pipe joints used in oil industry. M., Nedra, 1970.
  5. Epstein E.F., Maceychik V.I., Ivakhnin I.I. et al. Calculation of drill pipes in geological exploration drilling. M., Nedra, 1979.

Similar articles

On correlation of well wall stability with carbonateness of clayey rocks
1982 D. I. Bereseneva, Yu. M. Chaschinov, L. A. Kuzmenko
Analysis of temperature regime of geothermal wells
1982 Yu. M. Pariysky, N. A. Gavrilov
Drilling-melting of rocks
1982 V. K. Chistyakov
About some peculiarities of pneumatic percussion drilling with gas-liquid agents
1982 N. D. Mikhailova
Estimation of efficiency of the method of accelerated well plugging
1982 N. I. Nikolaev, L. A. Tereshchenko, L. K. Gorshkov, A. M. Yakovlev
Efficiency of foam application in drilling for solid minerals
1982 A. M. Yakovlev, V. I. Kovalenko, A. V. Golovkin