Estimation of efficiency of the method of accelerated well plugging
Abstract
At geological exploration drilling for elimination of all kinds of complications is spent up to 25% of the calendar time of work of drilling rigs, and drilling productivity in some cases is halved ...
Область исследования:
(Archived) Without section
References
- Lipatov N.K., Patrushev G.V. Device for isolation of zones of wash fluid absorption and water influxes in wells. A.s. № 451835 (USSR). Published in B.I., 1975, No. 44.
- Nikolaev N.I., Tereshchenko L.A., Yakovlev A.M. et al. Device for liquidation of complications in a well. A.c. № 685808 (USSR). Published in B.I., 1979, № 34.
- Rudenko A.P. Tamponization and patching of wells in diamond drilling. L., Nedra, 1978.
Similar articles
Efficiency of foam application in drilling for solid minerals
1982 A. M. Yakovlev, V. I. Kovalenko, A. V. Golovkin
Fundamentals of the theory and calculation of pressure during foam movement in a borehole
1982 B. B. Kudryashov, Yu. D. Muraev, V. Ya. Klimov
About some peculiarities of pneumatic percussion drilling with gas-liquid agents
1982 N. D. Mikhailova