Estimation of efficiency of the method of accelerated well plugging
Abstract
At geological exploration drilling for elimination of all kinds of complications is spent up to 25% of the calendar time of work of drilling rigs, and drilling productivity in some cases is halved ...
Область исследования:
(Archived) Without section
References
- Lipatov N.K., Patrushev G.V. Device for isolation of zones of wash fluid absorption and water influxes in wells. A.s. № 451835 (USSR). Published in B.I., 1975, No. 44.
- Nikolaev N.I., Tereshchenko L.A., Yakovlev A.M. et al. Device for liquidation of complications in a well. A.c. № 685808 (USSR). Published in B.I., 1979, № 34.
- Rudenko A.P. Tamponization and patching of wells in diamond drilling. L., Nedra, 1978.
Similar articles
Fundamentals of the theory and calculation of pressure during foam movement in a borehole
1982 B. B. Kudryashov, Yu. D. Muraev, V. Ya. Klimov