Investigation of the lifting capacity of a hoisting installation with a flexible imported organ

Authors:
N. P. Boitsov
Date submitted:
1982-09-17
Date accepted:
1982-11-15
Date published:
1983-05-23

Abstract

Construction and operation of underground structures are always associated with the use of lifting machines. The most widespread at modern enterprises are machines with friction pulley.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 97

References

  1. A.s. 839997 (USSR); A.s. 848465 (USSR).
  2. Bely V.D., Naidenko I.S. Mine multi-rope hoisting installations, M., Nedra, 1966.
  3. Verstakov G.V., Stepanov A.G. Mine hoisting installations, Perm, PH of Perm Polytechnic, Inst., 1969. Part I.
  4. Fedorova Z.M. Mine stationary installations. M., Nedra, 1966.

Similar articles

Peculiarities of wear of cascade devices and ways of their protection on difficult routes
1983 V. N. Pokrovskaya, L. G. Gambaryan, E. V. Sergeev
Bench for investigation of mechanohydraulic method of high-strength rock fracture
1983 I. I. Doroshenko
Experience of application of positive displacement pumps for hydraulic long-distance transportation of ore concentrates
1983 Yu. N. Gulyaev, A. S. Medvedev
Quarry plants on the basis of axial fans
1983 E. V. Parakhonsky
Maximum watering of wells at mechanized charging with hot pouring water-filled explosives through a water column
1983 K. A. Dolgov, S. V. Krasavin
To the question of operation life of mine hoisting machines
1983 O. N. Chashnikov