Submit an Article
Become a reviewer
Vol 97
Pages:
40-42
Download volume:
RUS
Article

To the question of operation life of mine hoisting machines

Authors:
O. N. Chashnikov
Date submitted:
1982-09-24
Date accepted:
1982-11-15
Date published:
1983-05-23

Abstract

At the shaft No. I of Borislav ozokerite ore management (BORU) since 1946 is operated mine hoisting machine with two drums with a diameter of 4.5 m and width of 1.4 m.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 97

Similar articles

Determination of pressure wave velocity in hydraulic drive trunk lines
1983 G. D. Slabozhanin, V. D. Slabozhanin
Bench for investigation of mechanohydraulic method of high-strength rock fracture
1983 I. I. Doroshenko
Method of determination of technically justified productivity of harvesters
1983 M. D. Kolomiytsov
One of the directions of creation of the automated drives of the executive bodies of the mining machines
1983 B. S. Makhovikov
Hydraulic cleaning of internal surfaces of compressor pipes
1983 Yu. G. Chernyshev, V. G. Shatsillo, M. B. Wisblat
Economic-mathematical model of selection and calculation of parameters of the multi-drive belt conveyor with intermediate vacuum drives
1983 K. A. Vasiliev, D. A. Jungmeister