Abstract

At the shaft No. I of Borislav ozokerite ore management (BORU) since 1946 is operated mine hoisting machine with two drums with a diameter of 4.5 m and width of 1.4 m.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 97

Similar articles

Method of determination of technically justified productivity of harvesters
1983 M. D. Kolomiytsov
Equations of transition curves of wheel teeth cut by a rack-and-pinion producing contour with combined profile displacement
1983 I. P. Ivanov
Dynamics of the rotary mechanism of pneumatic perforators
1983 V. M. Vasiliev, S. S. Smorodin, V. B. Sokolinsky
Experimental studies of traction mode of electromechanical transmission of dump dump trucks
1983 A. A. Kuleshov, Yu. A. Plyutov
Probabilistic analysis of shearer harvester loads
1983 E. L. Kantor
Investigation of the lifting capacity of a hoisting installation with a flexible imported organ
1983 N. P. Boitsov