Submit an Article
Become a reviewer
Vol 97
Pages:
30-33
Download volume:
RUS
Article

Maximum watering of wells at mechanized charging with hot pouring water-filled explosives through a water column

Authors:
K. A. Dolgov
S. V. Krasavin
Date submitted:
1982-09-27
Date accepted:
1982-11-20
Date published:
1983-05-23

Abstract

In practice, two main methods of mechanized charging of wells are known: from the wellhead and from the bottom hole. With increasing depth of development at quarries the number of watered wells is increasing, which significantly changes the technology of charging wells with hot pouring water-filled explosives (HLWFE).

Область исследования:
(Archived) Without section
Go to volume 97

Similar articles

Quarry plants on the basis of axial fans
1983 E. V. Parakhonsky
Hydraulic cleaning of internal surfaces of compressor pipes
1983 Yu. G. Chernyshev, V. G. Shatsillo, M. B. Wisblat
Equations of transition curves of wheel teeth cut by a rack-and-pinion producing contour with combined profile displacement
1983 I. P. Ivanov
Dynamics of the rotary mechanism of pneumatic perforators
1983 V. M. Vasiliev, S. S. Smorodin, V. B. Sokolinsky
Conclusion of the basic equation of the open thermodynamic system of pneumatic drive
1983 G. A. Terekhov
Mathematical description of the drive of the rotary-feeding mechanism of a drilling machine
1983 K. G. Asatur, B. S. Makhovikov, O. V. Kabanov, G. M. Egorov, S. G. Zaritsky