Experience in the use of non-stroked water-containing explosives in industrial conditions
Abstract
The Vivikond open pit mine uses a non-transportation system of mining. Overburden rocks - peat, sands, loams and clays with an average thickness of 5 m and limestone with an average thickness of 8 m are moved by excavators ESH-10/60, ESH-15/90 and excavator EKG-4,6 into the excavated space at a distance of 40 m.