Conducting drilling and blasting works in cramped conditions

Authors:
V. P. Tarasenko
V. I. Sivenkov
V. V. Pupkov
Date submitted:
1983-07-13
Date accepted:
1983-09-20
Date published:
1984-12-06

Abstract

To conduct the most labor-intensive mining work in the construction of excavations, trenches, site planning is the most widely used drilling and blasting method. However, the use of blasting is often hampered by cramped conditions, when in the immediate vicinity are buildings, structures and other objects.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 99

Similar articles

Estimation of efficiency of rock block jackhammering taking into account interblock fracturing
1984 A. V. Zditovetsky, G. S. Lursmanashvili
Investigation of rock fracture peculiarities under conditions of complex stress state
1984 S. A. Kozyrev, S. V. Lukichev, D. S. Podozersky
Definition of optimum degree of crushing granite massif by explosion on crushed stone quarries
1984 V. P. Makaryev, V. A. Mikhailov
Asymptotic small heat conduction solution of the Stefan problem of permafrost thawing in an electromagnetic field
1984 L. E. Rickenglaz
Possibilities of noise silencing at thermal processing of granite products
1984 V. K. Bubok, S. N. Samulyak
Dependence of the intensity of the shock air wave on the length and material of the bottom hole
1984 V. A. Borovikov, I. F. Vanyagin, V. A. Artemov, V. K. Khurtsidze