Submit an Article
Become a reviewer
Vol 105
Pages:
114-116
Download volume:
RUS
Article

Improvement of tying schemes for drilling with core transporting hydraulics

Authors:
V. A. Blinov
Date submitted:
1984-09-19
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Since the second half of 1983 at the coal fields of Vorkutinskaya GRE the KPS-300 unit has been mastered. Already drilled more than 7 thousand meters of pilot wells, the average depth of which was 110 meters, the maximum - 185 meters.

Область исследования:
(Archived) Without section
Go to volume 105

Similar articles

Estimation of hydraulic resistances at pneumatic impact drilling with foam
1985 V. Ya. Klimov
Investigation of technological parameters of well plugging process
1985 N. I. Nikolaev, V. I. Kovalenko
Study of physical and chemical properties of plugging systems based on their electrical conductivity
1985 S. N. Afanasyev, L. A. Tereshenko, I. L. Eberling
Change of permeability of reservoirs in downhole zones of hydrogeological wells during drilling by different methods
1985 V. A. Berezhnoy, V. V. Antonov, Yu. M. Pariysky
Pressure in the foam flow at water penetrations in a borehol
1985 A. M. Yakovlev, A. F. Kryuchkov
Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko