Improvement of tying schemes for drilling with core transporting hydraulics

Authors:
V. A. Blinov
Date submitted:
1984-09-19
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Since the second half of 1983 at the coal fields of Vorkutinskaya GRE the KPS-300 unit has been mastered. Already drilled more than 7 thousand meters of pilot wells, the average depth of which was 110 meters, the maximum - 185 meters.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

Similar articles

Results of experimental studies of borehole wall stability drilled in the ice massif
1985 V. M. Pashkevich
About dependence of wellbore stability on the degree of ignimbrite argyllization on the example of one field of the North-East.
1985 V. G. Portnov, D. I. Beresneva, V. P. Gnedina, Yu. M. Chashinov
Mathematical model of the process of melting of caverns in glacial rock
1985 A. A. Zemtsov, V. A. Chugunov
Saturation of drill bits with bulk diamonds of different grain size
1985 L. K. Gorshkov
Mathematical model of heat and mass transfer processes during fusion drilling of rocks
1985 V. K. Chistyakov
Evaluation of the efficiency of the design schemes of the automated underwater drilling machine
1985 V. Ya. Kipovsky, I. G. Shelkovnikov, S. O. Kochetov