Submit an Article
Become a reviewer
Vol 105
Pages:
59-64
Download volume:
RUS
Article

Investigation of technological parameters of well plugging process

Authors:
N. I. Nikolaev
V. I. Kovalenko
Date submitted:
1984-09-10
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Application of so-called "dry" quick-setting mixtures (DSM) based on mineral binders as plugging material for isolation of zones of geological complications (cleaning agent absorption, water influxes and intervals of unstable rocks associated with them) required creation of a number of special devices for delivery and processing of DSM directly in the well interval to be plugged.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

References

  1. Aitmatov I.T., Kravtsov B.I., Polovov B.D. Tamponization of watered rocks in mine construction. M., Nedra, 1972.
  2. Lomakin A.A. Centrifugal and axial pumps. M., Mashinostroenie, 1966.
  3. Timoshenko S.P. Resistance of Materials. M., Nauka, 1965. V. 2.

Similar articles

Results of experimental studies of borehole wall stability drilled in the ice massif
1985 V. M. Pashkevich
Justification of the experimental research methodology of the electrothermal drilling method
1985 Vladimir S. Litvinenko, V. K. Chistyakov, G. S. Brodov
Pressure in the foam flow at water penetrations in a borehol
1985 A. M. Yakovlev, A. F. Kryuchkov
Mathematical model of heat and mass transfer processes during fusion drilling of rocks
1985 V. K. Chistyakov
Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Improvement of tying schemes for drilling with core transporting hydraulics
1985 V. A. Blinov