Submit an Article
Become a reviewer
Vol 105
Pages:
34-37
Download volume:
RUS
Article

Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
##submission.archive.categories## Without section
Go to volume 105

Similar articles

Results of field tests of the high-frequency thermo-drilling complex TBS-112 HF while drilling a deep borehole in a low-temperature glacier cover (Vostok Station).
1985 E. A. Zagrivny
Mathematical model of the process of melting of caverns in glacial rock
1985 A. A. Zemtsov, V. A. Chugunov
Pressure in the foam flow at water penetrations in a borehol
1985 A. M. Yakovlev, A. F. Kryuchkov
Influence of properties of flushing agents on the process of well bottom hole cleaning
1985 N. D. Mikhailova
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok
Mathematical model of heat and mass transfer processes during fusion drilling of rocks
1985 V. K. Chistyakov