Submit an Article
Become a reviewer
Vol 105
Pages:
34-37
Download volume:
RUS
Article

Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Go to volume 105

Similar articles

About dependence of wellbore stability on the degree of ignimbrite argyllization on the example of one field of the North-East.
1985 V. G. Portnov, D. I. Beresneva, V. P. Gnedina, Yu. M. Chashinov
Influence of properties of flushing agents on the process of well bottom hole cleaning
1985 N. D. Mikhailova
Results of field tests of the high-frequency thermo-drilling complex TBS-112 HF while drilling a deep borehole in a low-temperature glacier cover (Vostok Station).
1985 E. A. Zagrivny
Improvement of tying schemes for drilling with core transporting hydraulics
1985 V. A. Blinov
Evaluation of the efficiency of the design schemes of the automated underwater drilling machine
1985 V. Ya. Kipovsky, I. G. Shelkovnikov, S. O. Kochetov
Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko