Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Go to volume 105

Similar articles

Evaluation of the efficiency of the design schemes of the automated underwater drilling machine
1985 V. Ya. Kipovsky, I. G. Shelkovnikov, S. O. Kochetov
Study of physical and chemical properties of plugging systems based on their electrical conductivity
1985 S. N. Afanasyev, L. A. Tereshenko, I. L. Eberling
Saturation of drill bits with bulk diamonds of different grain size
1985 L. K. Gorshkov
Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
About dependence of wellbore stability on the degree of ignimbrite argyllization on the example of one field of the North-East.
1985 V. G. Portnov, D. I. Beresneva, V. P. Gnedina, Yu. M. Chashinov