Calculation of the working process of a compressor with a liquid piston for gas-liquid systems

Authors:
V. G. Vartykyan
N. S. Vulisanov
A. I. Kirsanov
N. I. Slyusarev
O. Yu. Ustyushenkova
Date submitted:
1984-09-15
Date accepted:
1984-11-14
Date published:
1985-11-27

Abstract

To improve the technological processes of drilling in difficult geological and technical conditions by using foam flushing systems (FFS) requires compressed gas of medium or high pressure. A new direction in the search for effective ways of obtaining FPS was the use for these purposes of compressor-compression devices (CCD), implemented on the bases of drilling pumps.

Область исследования:
(Archived) Without section
Go to volume 105

Similar articles

Estimation of hydraulic resistances at pneumatic impact drilling with foam
1985 V. Ya. Klimov
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
Study of physical and chemical properties of plugging systems based on their electrical conductivity
1985 S. N. Afanasyev, L. A. Tereshenko, I. L. Eberling
Justification of the experimental research methodology of the electrothermal drilling method
1985 Vladimir S. Litvinenko, V. K. Chistyakov, G. S. Brodov
Methodology of well trajectory design on computer program
1985 E. F. Alexandrov, L. P. Gorkov, E. I. Slepova, G. K. Shcherbakov
Change of permeability of reservoirs in downhole zones of hydrogeological wells during drilling by different methods
1985 V. A. Berezhnoy, V. V. Antonov, Yu. M. Pariysky