Transportation of hardening embedded mixtures by polyethylene pipes
Authors:
Abstract
Backfill mixtures into the excavated space are usually fed by steel pipelines laid along the existing mine workings, and their routes are far from ideal in terms of the maximum required length of delivery in gravity mode.