Algorithm of reliability assessment of the hydrotransport system with unloaded reserve and recovery
Abstract
A slurry pumping system is considered, in which there are several working lines consisting of pumps in series and several reserve lines, which are switched on in case of failure of the main working.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
To the issue of efficiency of braking systems of dump trucks of especially large load-carrying capacity
1987 M. S. Semakin
Determination of operation level and condition of tailing ponds by the method of expert evaluations
1987 G. A. Railyan