Unit for construction of large-span underground excavations

Authors:
V. G. Ivanov
Date submitted:
1986-07-20
Date accepted:
1986-09-16
Date published:
1987-06-19

Abstract

The AMKI unit was created in Leningrad for the construction of single-wall subway stations. The unit is a transportation and tunneling complex, in which the transportation devices are its main structural element.

Область исследования:
(Archived) Without section
Go to volume 110

Similar articles

Rational level of reliability of transportation systems of quarries
1987 A. A. Kuleshov, S. N. Reznikov
Thickening of fine slurries by plate thickener in industrial conditions
1987 V. P. Dokukin, S. A. Makarov
Prevention of sediments in slurry lines with the help of phosphorus-containing complexons
1987 Yu. N. Gulyaev
Ways to increase the lifting capacity of mine hoisting plants with friction pulley
1987 S. S. Naumov
Reduction of the number of pumping pumping stations on the main slurry pipelines
1987 A. B. Nezametdinov
Ways to increase reliability of operation of the linear part of hydraulic transportation systems
1987 A. N. Frakman