Algorithm of reliability assessment of the hydrotransport system with unloaded reserve and recovery
Abstract
A slurry pumping system is considered, in which there are several working lines consisting of pumps in series and several reserve lines, which are switched on in case of failure of the main working.
Область исследования:
(Archived) Without section
Similar articles
Qualitative and quantitative characteristics of hydromixtures of copper ore dressing tailings of Dzhezkazgan MMC
1987 I. Sh. Dzhunusov
Choice of rational types of excavator-automobile complexes at designing of a quarry
1987 O. D. Serebrennikov, A. M. Vdovichenko
Distribution of load between drives of a multi-drive belt conveyor