Submit an Article
Become a reviewer
Vol 116
Pages:
36-41
Download volume:
RUS
Article

Improvement of technical means and technology of plugging of complication zones in wells with dry quick-setting mixtures

Authors:
N. I. Nikolaev
A. I. Ishchenko
Date submitted:
1987-08-30
Date accepted:
1987-10-02
Date published:
1988-12-14

Abstract

The main technological feature of operational well plugging with dry quick-setting mixtures (QSM) is the delivery of a certain amount of plugging material to a given interval, its mixing with water and processing by special plugging devices directly in the zone of geological sedimentation.

Область исследования:
(Archived) Without section
Go to volume 116

Similar articles

Determination of resonance frequencies of drilling shell rotation on the basis of wave equation solution
1988 L. K. Gorshkov, A. K. Arno, A. N. Sherstnev
Calculation methodology of technological parameters of removable core tamper extraction unit
1988 V. Ya. Kipovsky, I. G. Shelkovnikov, O. G. Voronin
Influence of fly ash additives on plugging stone structure
1988 V. G. Portnov, L. A. Tereshenko, S. N. Afanasyev
Influence of bottomhole pressure of flushing fluid and its type on the mechanical speed of diamond drilling
1988 A. N. Kholodok, D. Yu. Borovsky, I. V. Godun
Development of auger core drill bits for drilling of snow and firn deposits in Antarctica
1988 S. P. Zhigalev, A. M. Shkurko
Experimental studies of the temperature regime of diamond drill bits during drilling with foam flushing
1988 V. Ya. Klimov, A. A. Yakovlev, A. N. Zavodchikov, A. A. Romanov