Submit an Article
Become a reviewer
Vol 116
Pages:
36-41
Download volume:
RUS
Article

Improvement of technical means and technology of plugging of complication zones in wells with dry quick-setting mixtures

Authors:
N. I. Nikolaev
A. I. Ishchenko
Date submitted:
1987-08-30
Date accepted:
1987-10-02
Date published:
1988-12-14

Abstract

The main technological feature of operational well plugging with dry quick-setting mixtures (QSM) is the delivery of a certain amount of plugging material to a given interval, its mixing with water and processing by special plugging devices directly in the zone of geological sedimentation.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 116

Similar articles

Calculation methodology of technological parameters of removable core tamper extraction unit
1988 V. Ya. Kipovsky, I. G. Shelkovnikov, O. G. Voronin
Peculiarities of mineral composition of mudstone fracture planes during drilling
1988 D. I. Beresneva, Yu. M. Chashinov
Thermodynamic processes during well drilling and method of their mathematical modeling
1988 Yu. M. Pariysky, T. Yu. Piskacheva
Complex of technical means for sampling for carbon analysis from ice strata
1988 A. A. Zemtsov, N. G. Menshikov
Development of auger core drill bits for drilling of snow and firn deposits in Antarctica
1988 S. P. Zhigalev, A. M. Shkurko
Determination of resonance frequencies of drilling shell rotation on the basis of wave equation solution
1988 L. K. Gorshkov, A. K. Arno, A. N. Sherstnev