Submit an Article
Become a reviewer
Vol 117
Pages:
16-18
Download volume:
RUS
Article

Treatment mode of mine water at Estonslanets Production Association

Authors:
O. N. Chashnikov
Date submitted:
1987-09-03
Date accepted:
1987-11-08
Date published:
1988-11-25

Abstract

The Estonian oil shale deposit is heavily watered, which leads to the necessity to pump out a large amount of water during development.

Область исследования:
(Archived) Without section
Go to volume 117

References

  1. Asatur K.G. About differential equations of the suspended flow // Izvestiya AS USSR. Fluid and Gas Technique. 1971. № 2.
  2. Degremoy V.P. Technical notes on water problems. Part 1, 2. M. Stroyizdat, 1983.
  3. Ibad-Zade Y.A., Nuriev Ch.G. Calculation of sumps. M. Stroyizdat, 1972.
  4. Parakhonskiy E.V. Technology and organization of nature protection works in PO Estonslanets / Central Scientific Research Institute of Coal. M., 1991 (Coal mining by open-cut method: Express-inform.).

Similar articles

Results of oceanic tests of the bottom soil investigation unit
1988 I. P. Timofeev, N. K. Ulashchik, E. M. Ulyanov
Method of transportation through pipes with percussive impact on fluid
1988 A. B. Nezametdinov
Wear and durability of embedded pipelines
1988 L. G. Gambaryan
Influence of relaxation oscillations of a brake shoe on the braking process
1988 M. M. Vetyukov, M. Yu. Platovskikh
Evaluation of the efficiency of transportation support for offshore subsea exploration works
1988 D. A. Jungmeister, V. Ya. Kipovsky, I. G. Shelkovnikov
Device for pump capacity change in a model stand of hydraulic drive of a drilling machine
1988 K. N. Podozerov