Submit an Article
Become a reviewer
Vol 117
Pages:
16-18
Download volume:
RUS
Article

Treatment mode of mine water at Estonslanets Production Association

Authors:
O. N. Chashnikov
Date submitted:
1987-09-03
Date accepted:
1987-11-08
Date published:
1988-11-25

Abstract

The Estonian oil shale deposit is heavily watered, which leads to the necessity to pump out a large amount of water during development.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 117

References

  1. Asatur K.G. About differential equations of the suspended flow // Izvestiya AS USSR. Fluid and Gas Technique. 1971. № 2.
  2. Degremoy V.P. Technical notes on water problems. Part 1, 2. M. Stroyizdat, 1983.
  3. Ibad-Zade Y.A., Nuriev Ch.G. Calculation of sumps. M. Stroyizdat, 1972.
  4. Parakhonskiy E.V. Technology and organization of nature protection works in PO Estonslanets / Central Scientific Research Institute of Coal. M., 1991 (Coal mining by open-cut method: Express-inform.).

Similar articles

Determination of air parameters during its movement through the pipeline
1988 K. A. Dolgov
Stresses of wheel teeth cut by copying depressions
1988 I. P. Ivanov
Experience of struggle against overgrowing of the main copper concentrate slurry lines with mineral-organic deposits
1988 Yu. N. Gulyaev, V. D. Negerdus
Dynamics of ropes in hoisting installations with friction pulleys and tensioning devices
1988 S. S. Naumov
Energy method of predicting the resource of mining machines
1988 M. D. Kolomiytsov
Dynamics of the feed drive of a roller cone drilling machine
1988 O. V. Kabanov, B. S. Makhovikov, S. G. Zaritsky