Energy method of predicting the resource of mining machines
Authors:
Abstract
Currently, the power of drives (motors and gearboxes) of harvesters has increased dramatically.
Область исследования:
(Archived) Without section
References
- Gmurman V.E. Theory of Probabilities and Mathematical Statistics. Moscow: Higher School, 1977.
- Kolomiitsov M.D. Method of Forecasting of Combine Harvester Operation // Journal of Mining Institute. V.87. Iss. 1. 1981.
- Makhovikov B.S., Kolomiitsov M.D., Andreev A.G. Device for control of the operation modes and determination of the operating time of the shearer // Mining Machines and Automation. 1977. № 6.
- Rabinovich S.G. Measurement errors. L. Energia, 1978.
- Statistical Methods in Experimental Physics. M.: Atomizdat, 1976.
Similar articles
Mine hoisting installations with equalizing devices of the reconstructed mines of PA Vorkutaugol
1988 V. A. Kabanov
Dynamics of the feed drive of a roller cone drilling machine
1988 O. V. Kabanov, B. S. Makhovikov, S. G. Zaritsky
Method of determination of optimum parameters of a lifting installation on the computer
1988 N. P. Boytsov, L. N. Zuev