Analysis of AMK unit operation at Lenmetrostroy mines
Authors:
Abstract
When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.
Область исследования:
(Archived) Without section
Similar articles
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev