Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Go to volume 126

Similar articles

Development of researches on application of high-pressure water jet
1991 Cheng Da Jun
Quantitative safety assessment of crushers at the design stage
1991 V. V. Denegin, A. I. Talko, Yu. R. Marusov
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Issues of improvement of designs and operation of regulated pumps
1991 A. B. Nezametdinov, A. N. Frakman
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky
Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev