Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
##submission.archive.categories## Without section
Go to volume 126

Similar articles

Experimental researches of parameters of dump trucks movement on coal pits of Vietnam
1991 Fan Xuan Bin
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky
To the question of mathematical modeling of dump trucks movement
1991 Purevtogtokh Baldangiin
Integral characteristics of sulfur-water mixture during flow in fracture fracture
1991 E. V. Sergeev, A. S. Maksimov
Hydraulically driven direct acting drilling pump
1991 A. S. Davydov