Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Go to volume 126

Similar articles

Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev
Hydraulically driven direct acting drilling pump
1991 A. S. Davydov
Issues of improvement of designs and operation of regulated pumps
1991 A. B. Nezametdinov, A. N. Frakman
Protection of highways from snow avalanches at the highland quarries
1991 R. A. Gevorgyan
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky