Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Resistance of a layer of deposits on a wall at destruction by a water jet
1991 K. G. Asatur, I. I. Doroshenko, V. V. Shilov
Strength calculations of large-module spur gears
1991 I. P. Ivanov
Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning
Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev
Analysis of electromechanical and electrohydraulic drives of mining machine actuators
1991 Yu. V. Lykov
Protection of highways from snow avalanches at the highland quarries
1991 R. A. Gevorgyan