Analysis of AMK unit operation at Lenmetrostroy mines
Authors:
Abstract
When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.
Область исследования:
##submission.archive.categories## Without section
Similar articles
Experimental researches of parameters of dump trucks movement on coal pits of Vietnam
1991 Fan Xuan Bin
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky