Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

To the question of mathematical modeling of dump trucks movement
1991 Purevtogtokh Baldangiin
Quantitative safety assessment of crushers at the design stage
1991 V. V. Denegin, A. I. Talko, Yu. R. Marusov
Strength calculations of large-module spur gears
1991 I. P. Ivanov
Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning
Multi-channel elevators for vertical passenger elevators of subways
1991 V. A. Kabanov
Development of researches on application of high-pressure water jet
1991 Cheng Da Jun