Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Strength calculations of large-module spur gears
1991 I. P. Ivanov
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky
Investigation of the automated hydraulic drive of the roller cone drilling machines
1991 B. S. Makhovikov, O. V. Kabanov, V. S. Solovev, S. G. Zaritsky, A. B. Molotilov
Development of researches on application of high-pressure water jet
1991 Cheng Da Jun
О влиянии функции распределения осреднений скорости на гидравлические характеристики потока
1991 Yu. N. Gulyaev
Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev