Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev
Cavitation tests of the vibrating suction system of hydraulic drive
1991 G. D. Slabozhanin
Issues of improvement of designs and operation of regulated pumps
1991 A. B. Nezametdinov, A. N. Frakman
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky
Method of selecting the rational mode of operation of combine harvester actuators
1991 A. M. Meshkov
Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning