Analysis of AMK unit operation at Lenmetrostroy mines
Authors:
Abstract
When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Analysis of electromechanical and electrohydraulic drives of mining machine actuators
1991 Yu. V. Lykov
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen