Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Analysis of electromechanical and electrohydraulic drives of mining machine actuators
1991 Yu. V. Lykov
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev
Cavitation tests of the vibrating suction system of hydraulic drive
1991 G. D. Slabozhanin
Development of researches on application of high-pressure water jet
1991 Cheng Da Jun
Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev