Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev
Investigation of the automated hydraulic drive of the roller cone drilling machines
1991 B. S. Makhovikov, O. V. Kabanov, V. S. Solovev, S. G. Zaritsky, A. B. Molotilov
Strength calculations of large-module spur gears
1991 I. P. Ivanov
Load-carrying device for natural stone blocks
1991 G. V. Sokolov, Yu. S. Fedorov
Influence of fracture step on specific energy consumption of the process of mechanohydraulic tool interaction with rocks
1991 A. B. Zhabin, A. S. Plekhanov, A. A. Gruzintsev, I. G. Marshinkovskii
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen