Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Resistance of a layer of deposits on a wall at destruction by a water jet
1991 K. G. Asatur, I. I. Doroshenko, V. V. Shilov
Investigation of the automated hydraulic drive of the roller cone drilling machines
1991 B. S. Makhovikov, O. V. Kabanov, V. S. Solovev, S. G. Zaritsky, A. B. Molotilov
Experimental researches of parameters of dump trucks movement on coal pits of Vietnam
1991 Fan Xuan Bin
Cavitation tests of the vibrating suction system of hydraulic drive
1991 G. D. Slabozhanin
Method of estimation of mining machines operation quality
1991 M. D. Kolomiytsov
About application of L.Euler's equation to pumps
1991 S. S. Smorodin