Analysis of AMK unit operation at Lenmetrostroy mines
Authors:
Abstract
When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
О влиянии функции распределения осреднений скорости на гидравлические характеристики потока
1991 Yu. N. Gulyaev
On the influence of the averaged velocity distribution function on the hydraulic characteristics of the flow
1991 Yu. N. Gulyaev