Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Go to volume 126

Similar articles

Hydraulically driven direct acting drilling pump
1991 A. S. Davydov
Development of researches on application of high-pressure water jet
1991 Cheng Da Jun
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Strength calculations of large-module spur gears
1991 I. P. Ivanov
Method of selecting the rational mode of operation of combine harvester actuators
1991 A. M. Meshkov
Protection of highways from snow avalanches at the highland quarries
1991 R. A. Gevorgyan