Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Issues of improvement of designs and operation of regulated pumps
1991 A. B. Nezametdinov, A. N. Frakman
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Quantitative safety assessment of crushers at the design stage
1991 V. V. Denegin, A. I. Talko, Yu. R. Marusov
Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning
Protection of highways from snow avalanches at the highland quarries
1991 R. A. Gevorgyan
Frictional auto oscillations of dual mass braking devices
1991 M. M. Vetyukov, R. F. Nagaev, M. Yu. Platovskikh