Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Go to volume 126

Similar articles

About application of L.Euler's equation to pumps
1991 S. S. Smorodin
Hydraulically driven direct acting drilling pump
1991 A. S. Davydov
On the influence of the averaged velocity distribution function on the hydraulic characteristics of the flow
1991 Yu. N. Gulyaev
Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev
Method of selecting the rational mode of operation of combine harvester actuators
1991 A. M. Meshkov
Quantitative safety assessment of crushers at the design stage
1991 V. V. Denegin, A. I. Talko, Yu. R. Marusov