Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning
Integral characteristics of sulfur-water mixture during flow in fracture fracture
1991 E. V. Sergeev, A. S. Maksimov
Cavitation tests of the vibrating suction system of hydraulic drive
1991 G. D. Slabozhanin
Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Influence of fracture step on specific energy consumption of the process of mechanohydraulic tool interaction with rocks
1991 A. B. Zhabin, A. S. Plekhanov, A. A. Gruzintsev, I. G. Marshinkovskii