Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Go to volume 126

Similar articles

Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Multi-channel elevators for vertical passenger elevators of subways
1991 V. A. Kabanov
On the influence of the averaged velocity distribution function on the hydraulic characteristics of the flow
1991 Yu. N. Gulyaev
Integral characteristics of sulfur-water mixture during flow in fracture fracture
1991 E. V. Sergeev, A. S. Maksimov
Strength calculations of large-module spur gears
1991 I. P. Ivanov
О влиянии функции распределения осреднений скорости на гидравлические характеристики потока
1991 Yu. N. Gulyaev