Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Research article
Without section

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Go to volume 126

Similar articles

Method of estimation of mining machines operation quality
1991 M. D. Kolomiytsov
Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev
Experimental researches of parameters of dump trucks movement on coal pits of Vietnam
1991 Fan Xuan Bin
Method of selecting the rational mode of operation of combine harvester actuators
1991 A. M. Meshkov