Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Working of a centrifugal pump
1991 B. S. Makhovikov, Guo Zhen Ning
About application of L.Euler's equation to pumps
1991 S. S. Smorodin
Protection of highways from snow avalanches at the highland quarries
1991 R. A. Gevorgyan
Multi-channel elevators for vertical passenger elevators of subways
1991 V. A. Kabanov
Load-carrying device for natural stone blocks
1991 G. V. Sokolov, Yu. S. Fedorov
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen