Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Integral characteristics of sulfur-water mixture during flow in fracture fracture
1991 E. V. Sergeev, A. S. Maksimov
Frictional auto oscillations of dual mass braking devices
1991 M. M. Vetyukov, R. F. Nagaev, M. Yu. Platovskikh
О влиянии функции распределения осреднений скорости на гидравлические характеристики потока
1991 Yu. N. Gulyaev
Development of researches on application of high-pressure water jet
1991 Cheng Da Jun
Strength calculations of large-module spur gears
1991 I. P. Ivanov
Resistance of a layer of deposits on a wall at destruction by a water jet
1991 K. G. Asatur, I. I. Doroshenko, V. V. Shilov