Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Go to volume 126

Similar articles

Resistance of a layer of deposits on a wall at destruction by a water jet
1991 K. G. Asatur, I. I. Doroshenko, V. V. Shilov
Quantitative safety assessment of crushers at the design stage
1991 V. V. Denegin, A. I. Talko, Yu. R. Marusov
Method of selecting the rational mode of operation of combine harvester actuators
1991 A. M. Meshkov
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Method of estimation of mining machines operation quality
1991 M. D. Kolomiytsov
О влиянии функции распределения осреднений скорости на гидравлические характеристики потока
1991 Yu. N. Gulyaev