Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev
Cavitation tests of the vibrating suction system of hydraulic drive
1991 G. D. Slabozhanin
Hydraulically driven direct acting drilling pump
1991 A. S. Davydov
Method of selecting the rational mode of operation of combine harvester actuators
1991 A. M. Meshkov
Method of estimation of mining machines operation quality
1991 M. D. Kolomiytsov
About application of L.Euler's equation to pumps
1991 S. S. Smorodin