Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Analysis of electromechanical and electrohydraulic drives of mining machine actuators
1991 Yu. V. Lykov
Strength calculations of large-module spur gears
1991 I. P. Ivanov
On the influence of the averaged velocity distribution function on the hydraulic characteristics of the flow
1991 Yu. N. Gulyaev
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
To the question of mathematical modeling of dump trucks movement
1991 Purevtogtokh Baldangiin
Experimental researches of parameters of dump trucks movement on coal pits of Vietnam
1991 Fan Xuan Bin