Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

О влиянии функции распределения осреднений скорости на гидравлические характеристики потока
1991 Yu. N. Gulyaev
On the influence of the averaged velocity distribution function on the hydraulic characteristics of the flow
1991 Yu. N. Gulyaev
Experimental researches of parameters of dump trucks movement on coal pits of Vietnam
1991 Fan Xuan Bin
Hydraulically driven direct acting drilling pump
1991 A. S. Davydov
Strength calculations of large-module spur gears
1991 I. P. Ivanov
Issues of improvement of designs and operation of regulated pumps
1991 A. B. Nezametdinov, A. N. Frakman