Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

To the question of mathematical modeling of dump trucks movement
1991 Purevtogtokh Baldangiin
Analysis of electromechanical and electrohydraulic drives of mining machine actuators
1991 Yu. V. Lykov
Improvement of algorithm of calculation of compressor unit network characteristic
1991 V. V. Klassen
Books of 17th-18th centuries on mechanics in mining in the main library of LMI
1991 V. G. Bauman
Quantitative safety assessment of crushers at the design stage
1991 V. V. Denegin, A. I. Talko, Yu. R. Marusov
Stand for research of pneumatic tires performance characteristics
1991 V. Yu. Koptev