Submit an Article
Become a reviewer
Vol 126
Pages:
125-128
Download volume:
RUS
Article

Analysis of AMK unit operation at Lenmetrostroy mines

Authors:
A. A. Khalilov
Date submitted:
1990-09-03
Date accepted:
1990-11-03
Date published:
1991-04-11

Abstract

When conducting the stations of the Leningrad Metro, the tunnels are conducted first, then the calotte slot (the upper part of the station vault with a height of 3.5 m), and the main part of the station is developed with the help of excavators of the "Gidravlik" type and boom tunneling machines.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 126

Similar articles

Resistance of a layer of deposits on a wall at destruction by a water jet
1991 K. G. Asatur, I. I. Doroshenko, V. V. Shilov
Research of thermal load of 33.00-51 tires in conditions of Kostomuksha mining and processing plant
1991 S. V. Medvedev
Frictional auto oscillations of dual mass braking devices
1991 M. M. Vetyukov, R. F. Nagaev, M. Yu. Platovskikh
Application of electrochemical method for control of organosaline deposits in the hydraulic transportation system
1991 A. S. Medvedev, M. M. Kryzhanovsky
Cavitation tests of the vibrating suction system of hydraulic drive
1991 G. D. Slabozhanin
On the influence of the averaged velocity distribution function on the hydraulic characteristics of the flow
1991 Yu. N. Gulyaev