The article considers variants of stripping and development systems with longitudinal preparation of the mining front in conditions of achieving the highest productivity of the open pit Ar. The calculations are based on the length of deposits Lp, their horizontal thickness t, the length Le and the number of blocks on the ledge, the annual productivity of the excavator A b .