Problem statement. At the present time in the quarry "Mir", due to its high watering with brines (over 1000 m3 / h), especially acute issue of mining, technical and environmental safety in further excavation of minerals.
Creation of impervious blankets (PF3) around the "Mir" pipe does not solve the problem of utilization of highly toxic drainage brines: even under the protection of ASC in the quarry will be filtered brines with a flow rate of 300 m3/h and more.
The purpose of the work is a complex analysis of hydrogeological conditions of the Denislavskoye groundwater deposit taking into account the possible simultaneous mining of the Plesetskoye bauxite deposit ...