One of the important tasks of increasing the efficiency of mining enterprises is to ensure a high degree of homogeneity of the formed ore flows. The paper considers the method of optimization of the charge preparation process at the ore stockpile of PO Sevuralboksitruda. Optimization is performed for a promising two-stage stockpiling scheme, which is proposed to be introduced instead of the existing single-stage scheme.
Ensuring dynamic modes of stabilization of the quality of processed ores is one of the important directions of technical progress in enrichment plants in metallurgical enterprises.
Effective management of bauxite ore quality is an important reserve for increasing the profitability of production in the conditions of self-sufficiency.
In PO Sevuralboksitruda bauxite mining is carried out at five mines and open pit mine (OPM).