Problem statement. At the present time in the quarry "Mir", due to its high watering with brines (over 1000 m3 / h), especially acute issue of mining, technical and environmental safety in further excavation of minerals.
How to cite:
Mironenko V.A., Atroshenko F.G., Lobanov V.V. Method of additional plugging at the sections of impervious curtains created in cryolithozone // Journal of Mining Institute. 1991. Vol. 129 . p. 83-90.
Creation of impervious blankets (PF3) around the "Mir" pipe does not solve the problem of utilization of highly toxic drainage brines: even under the protection of ASC in the quarry will be filtered brines with a flow rate of 300 m 3 /h and more.
How to cite:
Shemyakin V.N., Atroshenko F.G., Shipulina M.G. Investigation of injection well injectivity issues // Journal of Mining Institute. 1991. Vol. 129 . p. 95-99.
The purpose of the work is a complex analysis of hydrogeological conditions of the Denislavskoye groundwater deposit taking into account the possible simultaneous mining of the Plesetskoye bauxite deposit ...
How to cite:
Atroshenko F.G., Lomakin E.A., Malov A.I., Fortygin V.S. Analysis of hydrogeological conditions and justification of joint exploitation of Denislavskoye groundwater deposit and Plesetskoye bauxite deposits // Journal of Mining Institute. 1980. Vol. 80 . p. 97.