The methods of development of the V.P. Grib diamond deposit, characterized by complex engineering-geological and hydrogeological conditions, are considered. Based on the analysis of the conditions and taking into account the specifics of the geological structure, a combined method of development is proposed. The characteristic of the environmental problems arising with this method is given and engineering ways of their solution are outlined.