Submit an Article
Become a reviewer
D. V. Teterin
D. V. Teterin
G.V. Plekhanov Saint Petersburg Mining Institute
G.V. Plekhanov Saint Petersburg Mining Institute

Co-authors

Articles

Geotechnology
  • Date submitted
    2006-10-04
  • Date accepted
    2006-12-30
  • Date published
    2007-04-01

Causes of formation of temporarily inoperable quarry sides and methods of their preservation by means of creation of bulk prism

Article preview

For prevention of unwanted originating of non-working leases of a bead and running by them it is necessary to systematize and to analyse the reasons of their creation. The reasons of temporarily-non-working walls (TNWW) forming are expedient for partitioning on two base categoriesplanning and off-schedule. The internal reasons of creation TNWW are, as a rule, result of errors both defects at budgeting and conducting mining operations. Such reasons arise in internal system of activity of the operation.

How to cite: Kholodnyakov G.A., Teterin D.V. Causes of formation of temporarily inoperable quarry sides and methods of their preservation by means of creation of bulk prism // Journal of Mining Institute. 2007. Vol. 172. p. 117-120.