It is known that currently flooding application is being considered as the most extended method for the layer pressure supporting in Russia and of cause around all over the world. But there are a lot of physical and chemical barriers for the high oil recovery achievement that are linked with interactive of «water-rock» system. The results of research of the new technology for water-gas injection realization with use the pumpinjector equipment are presented at this article