The classifications of risks based on different parameters are considered; the specific risks of innovative projects are sorted out and structured. The approaches to the quantitative assessment of risks are analyzed, their features, contents, advantages and limits are determined. The conditions of appropriate usage of these approaches are considered. The possibilities of hierarchical process analysis method are shown.