Submit an Article
Become a reviewer
Vol 138
Pages:
116-117
Download volume:
RUS
Article

Justification of design schemes of devices for mounting and dismantling works of mechanized complexes in mines of Pechora basin

Authors:
Yu. I. Rogov
D. A. Jungmeister
Date submitted:
1992-09-27
Date accepted:
1992-11-27
Date published:
1993-12-28

Abstract

High capital intensity and weight of mining machines set the task of maximum reduction of operating costs, including the costs of installation and dismantling works (MDR). The task is to choose a criterion for evaluating the effectiveness of new MDR technologies and means of their technical realization. The formation of such a criterion involves the use of elements of praxeological analysis based on the study of the effectiveness of actions performed by analyzing the relationship between the goal and the result of the action.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Shot peening of drilling rods
1993 E. L. Korotkikh
Statics and kinematics of vehicles with spiral-chain traction device on inclined track
1993 N. P. Boytsov, I. N. Boytsova
Theoretical studies of parameters of a walking landing gear with a movable float
1993 I. P. Timofeev, N. K. Ulashchik
Automated calculation of optimal cutting modes during machining
1993 Yu. P. Boytsov
К вопросу о производительности щековой дробилки
1993 V. V. Denegin