Submit an Article
Become a reviewer
Vol 138
Pages:
116-117
Download volume:
RUS
Article

Justification of design schemes of devices for mounting and dismantling works of mechanized complexes in mines of Pechora basin

Authors:
Yu. I. Rogov
D. A. Jungmeister
Date submitted:
1992-09-27
Date accepted:
1992-11-27
Date published:
1993-12-28

Abstract

High capital intensity and weight of mining machines set the task of maximum reduction of operating costs, including the costs of installation and dismantling works (MDR). The task is to choose a criterion for evaluating the effectiveness of new MDR technologies and means of their technical realization. The formation of such a criterion involves the use of elements of praxeological analysis based on the study of the effectiveness of actions performed by analyzing the relationship between the goal and the result of the action.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

Mechanization schemes for creating protective coatings on bulk material bunches
1993 P. F. Korsakov
Calculation of connections with guaranteed interference fit for a given probability of failure-free operation
1993 E. S. Kuznetsov
Existence area of spur gear meshing with a given overlap coefficient
1993 S. L. Ivanov
Maximum stresses in tooth contact of spur gears
1993 I. P. Ivanov
Determination of bulk cargo motion parameters on curved surfaces with constant radius of curvature
1993 Yu. D. Tarasov
Statics and kinematics of vehicles with spiral-chain traction device on inclined track
1993 N. P. Boytsov, I. N. Boytsova