Justification of design schemes of devices for mounting and dismantling works of mechanized complexes in mines of Pechora basin

Authors:
Yu. I. Rogov
D. A. Jungmeister
Date submitted:
1992-09-27
Date accepted:
1992-11-27
Date published:
1993-12-28

Abstract

High capital intensity and weight of mining machines set the task of maximum reduction of operating costs, including the costs of installation and dismantling works (MDR). The task is to choose a criterion for evaluating the effectiveness of new MDR technologies and means of their technical realization. The formation of such a criterion involves the use of elements of praxeological analysis based on the study of the effectiveness of actions performed by analyzing the relationship between the goal and the result of the action.

Область исследования:
(Archived) Without section
Go to volume 138

Similar articles

Maximum stresses in tooth contact of spur gears
1993 I. P. Ivanov
Theoretical studies of parameters of a walking landing gear with a movable float
1993 I. P. Timofeev, N. K. Ulashchik
Analysis of 4PP-2M roadheader operation at Lenmetrostroy mine № 516
1993 A. A. Khalilov
Methods of determining the service life of mining equipment
1993 M. D. Kolomiytsov, B. S. Makhovikov
To the issue of studying the loading of resilient systems of dump trucks in the process of movement
1993 N. V. Zyryanov, V. Yu. Koptev
Determining the optimal match between the average and instantaneous loads of mining machines
1993 A. M. Meshkov