Technological scheme of the complex for overburden transportation and hydrodumping
Authors:
Abstract
One of the effective ways of overburden transportation at open pits is hydraulic transportation. Application of this method in the period of quarry operation is sometimes difficult due to the presence in the quarry of other technological schemes with the use of dry mining equipment or complicated mining and technical conditions. At the same time, when using only dry mining equipment, it is not always possible to solve the whole complex of problems associated with excavation, transportation and stacking of rocks in dumps at a high technical and economic level.
References
- Антонов B.A. Техника и экономика непрерывного транспорта на горных предприятиях. М.: Недра, 1967.
- Гусаров А.Д. Гидротранспорт высокопластичных грунтов от экскаватора (на открытых горных работах) // Сб. науч. трудов / НИИжелезобетонных изделий, строительных и нерудных материалов, М, 1963. Вып. 8.
- Нурок Г.А. Процессы и технология гидромеханизации открытых горных работ. М.: Недра, 1979.
- Покровская B.H. Пути повышения эффективности гидротранспорта. М.: Недра, 1972.
- Покровская B.H. Трубопроводный транспорт в горной промышленности. М.: Недра, 1989.
- Потапов А.К., Кульбацкий В.Б., Исаев П.Г. и др. К выбору схем разработки вскрышных пород Североонежского бокситового месторождения. М., 1981. - Деп. в ЦНИИцветмет экономики и информации 22.06.81, № 803.
- Потапов A.K., Новожилов В.Н., Боровик О.В. и др. Условия вскрытия и эксплуатации Североонежского бокситового месторождения. М. 1986. — Деп. в ЦНИИпветмет экономики и информации 02.11.86, № 1501.
- Тымовский Л.Г. Комбинированный транспорт на карьерах. М.: Госгортехиэдат, 1968.