Submit an Article
Become a reviewer
Vol 141
Pages:
26-30
Download volume:
RUS
Article

Loading of high-speed belt conveyors

Authors:
Yu. D. Tarasov
Date submitted:
1994-08-11
Date accepted:
1994-10-05
Date published:
1995-02-01

Abstract

Loading of high-speed main belt conveyors at conveyor belt velocities vl > 5 m/s is inexpedient to carry out with the help of traditional feeding devices, as well as chutes-accelerators, as the final velocities vk of cargo flow when using these technical means will always be less vl than the belt velocity of the main conveyor. Provision of the condition vc = vl is practically impossible for two reasons: it is necessary to have a large length of the inclined chute; the speed of cargo movement at speeds, even significantly lower than vl stabilizes due to the sailing of the cargo.

Область исследования:
(Archived) Without section
Go to volume 141

Similar articles

Reliability assessment of a multi-drive belt conveyor
1995 K. A. Vasiliev, I. I. Margolin
Methodology for predicting tire life of dump trucks
1995 V. Yu. Koptev
Improving the operational reliability of vehicles by improving current repairs, with the application of unit repairs
1995 R. S. Lukinskiy, I. G. Saprykin, V. N. Popov
Results of industrial tests of anti-smoke additives to diesel fuel in conditions of the Tsentralny mine of PO Apatit
1995 A. A. Kuleshov, O. D. Serebrennikov, V. A. Fomin
Mine transportation system driven by linear induction motors
1995 A. F. Borozenets
Efficiency of mine dump trucks with electric and mechanical drives for the conditions of the Udachny quarry
1995 I. V. Zyryanov, V. M. Bogatyrev, E. A. Potapova