Submit an Article
Become a reviewer
Vol 141
Pages:
26-30
Download volume:
RUS
Research article
Without section

Loading of high-speed belt conveyors

Authors:
Yu. D. Tarasov
Date submitted:
1994-08-11
Date accepted:
1994-10-05
Date published:
1995-02-01

Abstract

Loading of high-speed main belt conveyors at conveyor belt velocities v l > 5 m/s is inexpedient to carry out with the help of traditional feeding devices, as well as chutes-accelerators, as the final velocities v k of cargo flow when using these technical means will always be less v l than the belt velocity of the main conveyor. Provision of the condition v c = v l is practically impossible for two reasons: it is necessary to have a large length of the inclined chute; the speed of cargo movement at speeds, even significantly lower than v l stabilizes due to the sailing of the cargo.

Go to volume 141

Similar articles

Vacuum belt conveyor drives with nozzle air suction
1995 K. A. Vasiliev
Piping system for transportation of solid materials
1995 A. B. Nezametdinov
Dust control in medium crushing sections at potash mines in the Pre-Carpathian region
1995 M. M. Smetanin, I. P. Ozernoi
Research of dynamics of movement of dump dump trucks BelAZ-7519
1995 N. V. Zyryanov
Calculation of hydrotransport systems using computers
1995 V. I. Alexandrov, V. P. Dokukin, A. A. Kuleshov
Efficiency of mine dump trucks with electric and mechanical drives for the conditions of the Udachny quarry
1995 I. V. Zyryanov, V. M. Bogatyrev, E. A. Potapova