Article

Loading of high-speed belt conveyors

Authors:
Yu. D. Tarasov
Date submitted:
1994-08-11
Date accepted:
1994-10-05
Date published:
1995-02-01

Abstract

Loading of high-speed main belt conveyors at conveyor belt velocities vl > 5 m/s is inexpedient to carry out with the help of traditional feeding devices, as well as chutes-accelerators, as the final velocities vk of cargo flow when using these technical means will always be less vl than the belt velocity of the main conveyor. Provision of the condition vc = vl is practically impossible for two reasons: it is necessary to have a large length of the inclined chute; the speed of cargo movement at speeds, even significantly lower than vl stabilizes due to the sailing of the cargo.

Область исследования:
(Archived) Without section
Go to volume 141

Similar articles

Efficiency of mine dump trucks with electric and mechanical drives for the conditions of the Udachny quarry
1995 I. V. Zyryanov, V. M. Bogatyrev, E. A. Potapova
Calculation of hydrotransport systems using computers
1995 V. I. Alexandrov, V. P. Dokukin, A. A. Kuleshov
Environmental aspects of large-size tire operation at open-pit mines
1995 V. Yu. Koptev, A. A. Kuleshov
Research of dynamics of movement of dump dump trucks BelAZ-7519
1995 N. V. Zyryanov
Methodology for predicting tire life of dump trucks
1995 V. Yu. Koptev
Reliability assessment of a multi-drive belt conveyor
1995 K. A. Vasiliev, I. I. Margolin