Methods of charging explosive wells with aquatrinitrotoluene
About authors
- 1 — Institute of Mining of Ural Branch of RAS
- 2 — Institute of Mining of Ural Branch of RAS
- 3 — Institute of Mining of Ural Branch of RAS
- 4 — Institute of Mining of Ural Branch of RAS
Abstract
During the testing and industrial development of the process of charging wells with aquatools, a number of problems affecting the quality of explosive preparation of rock mass arose.
Область исследования:
(Archived) Without section
Similar articles
On approaches to determining blast efficiency in geotechnology
2001 V. M. Zakalinskii, N. N. Kazakov, Yu. P. Galchenko
Development of a fractured coal structure under the action of high pressure
2001 T. A. Vasilenko, P. I. Polyakov, T. A. Ryumshina, V. V. Slyusarev
On numerical simulation of stationary and non-stationary processes in fractured rocks
2001 Yu. S. Vakhrameev, P. Yu. Tverdokhlebov, A. V. Linnik, N. A. Skorkin