Submit an Article
Become a reviewer
Vol 148 Iss. 1
Pages:
189-192
Download volume:
RUS
Article

Energy performance of oversized lumps crushing with the use of standard and conversion blasting equipment

Authors:
A. V. Ivanov1
Yu. P. Zhelunitsin2
N. I. Sysoev3
Yu. G. Shchukin4
A. E. Frantov5
About authors
  • 1 — Vzrivtechnologia
  • 2 — Vzrivtechnologia
  • 3 — Vzrivtechnologia
  • 4 — Vzrivtechnologia
  • 5 — Vzrivtechnologia
Date submitted:
2000-06-14
Date accepted:
2000-07-20
Date published:
2001-12-18

Abstract

In the practice of rock excavation by borehole and borehole charges, oversized lumps of rock mass are formed, the yield of which is caused by: the physical and mechanical properties of rocks, the blockiness of rock masses, the parameters of drilling and blasting operations and other factors. The presence of oversized lumps of rocks on working platforms of open pits complicates technological processes of excavation and transport, reduces the efficiency of loading and transporting equipment. In underground mining the crushing of oversized lumps of rock mass is carried out on scraper tracks, in ducts and ore stacks, during the works in which the most difficult are the cases of jamming and vaulting.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 148

Similar articles

Explosion energy control during core charge excitation by shockwave action
2001 B. U. Raskildinov
Relaxation in soils and rocks
2001 A. V. Mikhalyuk
Numerical simulation of a blast effect in a soft formation
2001 V. G. Bazhenov, V. L. Kotov, A. V. Kochetkov
Dynamics of stochastic instability and fractal nature of fractures
2001 K. V. Khalkechev
Current state of the theory of detonation and methods of predicting parameters of condensed explosives
2001 K. K. Shvedov
Stress concentration and scale factor in the fracture of anisotropic rock
2001 Yu. M. Lebedkin, A. S. Matorin, V. G. Shemenev