Energy performance of oversized lumps crushing with the use of standard and conversion blasting equipment

Authors:
A. V. Ivanov1
Yu. P. Zhelunitsin2
N. I. Sysoev3
Yu. G. Shchukin4
A. E. Frantov5
About authors
  • 1 — Vzrivtechnologia
  • 2 — Vzrivtechnologia
  • 3 — Vzrivtechnologia
  • 4 — Vzrivtechnologia
  • 5 — Vzrivtechnologia
Date submitted:
2000-06-14
Date accepted:
2000-07-20
Date published:
2001-01-01

Abstract

In the practice of rock excavation by borehole and borehole charges, oversized lumps of rock mass are formed, the yield of which is caused by: the physical and mechanical properties of rocks, the blockiness of rock masses, the parameters of drilling and blasting operations and other factors. The presence of oversized lumps of rocks on working platforms of open pits complicates technological processes of excavation and transport, reduces the efficiency of loading and transporting equipment. In underground mining the crushing of oversized lumps of rock mass is carried out on scraper tracks, in ducts and ore stacks, during the works in which the most difficult are the cases of jamming and vaulting.

Область исследования:
(Archived) Without section
Go to volume 148

Similar articles

Estimation of microcracking in coal during methane desorption
2001 V. N. Odintsev
On some characteristics of a plastic wave
2001 E. S. Tkachenko
Fracture widening characteristics at blasting mining of granite in far zone
2001 V. A. Shekov, O. V. Myasnikova, M. G. Menzhulin
On numerical simulation of stationary and non-stationary processes in fractured rocks
2001 Yu. S. Vakhrameev, P. Yu. Tverdokhlebov, A. V. Linnik, N. A. Skorkin
Methods of charging explosive wells with aquatrinitrotoluene
2001 V. A. Sinitsyn, V. G. Shemenev, A. S. Matorin, A. A. Kotyashev
Mechanized method for the preparation of granulite-Zh and the results of its pilot tests
2001 V. A. Borovikov, I. A. Dibrov, A. A. Ryskunov, A. V. Kurushkin