Energy performance of oversized lumps crushing with the use of standard and conversion blasting equipment
About authors
- 1 — Vzrivtechnologia
- 2 — Vzrivtechnologia
- 3 — Vzrivtechnologia
- 4 — Vzrivtechnologia
- 5 — Vzrivtechnologia
Abstract
In the practice of rock excavation by borehole and borehole charges, oversized lumps of rock mass are formed, the yield of which is caused by: the physical and mechanical properties of rocks, the blockiness of rock masses, the parameters of drilling and blasting operations and other factors. The presence of oversized lumps of rocks on working platforms of open pits complicates technological processes of excavation and transport, reduces the efficiency of loading and transporting equipment. In underground mining the crushing of oversized lumps of rock mass is carried out on scraper tracks, in ducts and ore stacks, during the works in which the most difficult are the cases of jamming and vaulting.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Technological opportunities to improve properties of blended explosives based on experience in Mongolia and Yugoslavia (Serbia)
2001 Dragan Petrovich B., Zh. Zhamyan, A. V. Starshinov, V. Yu. Fadeev
State, prospects and expert evaluation of the optimal size of the possible use of industrial explosives in Russia
2001 A. S. Derzhavets, N. I. Rabotinskii, V. V. Adushkin
Formation and registration of solitons in granular media
2001 I. V. Belinskii, V. V. Grzhibovskii, V. A. Lemeshko