Energy performance of oversized lumps crushing with the use of standard and conversion blasting equipment
About authors
- 1 — Vzrivtechnologia
- 2 — Vzrivtechnologia
- 3 — Vzrivtechnologia
- 4 — Vzrivtechnologia
- 5 — Vzrivtechnologia
Abstract
In the practice of rock excavation by borehole and borehole charges, oversized lumps of rock mass are formed, the yield of which is caused by: the physical and mechanical properties of rocks, the blockiness of rock masses, the parameters of drilling and blasting operations and other factors. The presence of oversized lumps of rocks on working platforms of open pits complicates technological processes of excavation and transport, reduces the efficiency of loading and transporting equipment. In underground mining the crushing of oversized lumps of rock mass is carried out on scraper tracks, in ducts and ore stacks, during the works in which the most difficult are the cases of jamming and vaulting.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Inorganic explosives for safe means of priming charges in oil wells
2001 A. V. Smirnov, M. A. Ilyushin, I. V. Tselinskii, A. A. Kotomin, N. A. Petrova
Characteristics of explosive fracturing of overburden permafrost rocks
2001 B. N. Zarovnyaev, G. O. Kipriyanov, V. S. Sorokin
Use of bulk emulsion explosive to improve blast and production performance at Jingduicheng оpen pit
2001 Xiong Daiyu, Qin Hu, Ren Xiaoming, Wang Xuguang
Current state of the theory of detonation and methods of predicting parameters of condensed explosives
2001 K. K. Shvedov