Submit an Article
Become a reviewer
Vol 155 Iss. 2
Pages:
138-140
Download volume:
RUS
Article

Modeling of loading and transport complexes parameters for OAO Bor open pit conditions

Authors:
V. V. Khvan
About authors
  • Far East State Technical University
Date submitted:
2002-07-20
Date accepted:
2002-08-29
Date published:
2003-12-30

Abstract

The problem of optimization of design and operational parameters of loading-transport complexes with reference to conditions of OAO Bor open pit on the basis of statistical testing method is considered. The method allows modeling and optimizing the parameters of loading-transport complexes, increasing the level of organization of production processes, operative control of technological characteristics of loading and transport equipment with regard to the changes in the operating capacity of equipment, as well as mining and technical factors of individual faces and the open pit as a whole.

Область исследования:
(Archived) Mining electromechanics
Funding:

None

Go to volume 155

Similar articles

Material composition and formation conditions of Sarmatian deposits of the Stavropol arch
2003 A. V. Korkoshko
Optimization of oil and petroleum product pumping regimes in pipelines with intermediate pump stations using variable speed pumps
2003 A. P. Tumanskii
Engineering and geological surveys for reclamation of lands disturbed during field development (by the example of the SOBR)
2003 G. B. Pospekhov
Theoretical justification of the effective type of turbo-motor for the drive of hydraulic motors
2003 A. L. Bukin
Justification of parameters of underground coal bunker construction technology
2003 A. A. Vavilina
Mining rent in the modern system of taxation
2003 N. E. Maiorova