Submit an Article
Become a reviewer
Vol 155 No 2
Pages:
53-54
Download volume:
Research article
Geology

New methodology for developing bituminous deposits

Authors:
N. V. Faizullina
About authors
  • Almetyevsk Oil Institute
Date submitted:
2002-07-16
Date accepted:
2002-08-25
Date published:
2003-02-01

Abstract

The aim of the method is to create a method of effective displacement of bitumen and thereby increasing the extraction rate of bitumen through direct impact on the bitumen and its host sandstone, as well as by reducing the size of the extraction cell to the optimal size, which virtually eliminates uncontrolled output of directed heat flow through tectonic fractures, bypassing the bitumen layer in the extraction element. The method includes drilling of injection, drainage and production wells, injection of coolant through the injection wells, dewatering of the bitumen layer with the drainage well and extraction of bitumen through the production well.

Go to volume 155

Similar articles

Optimization of oil and petroleum product pumping regimes in pipelines with intermediate pump stations using variable speed pumps
2003 A. P. Tumanskii
Working out the development strategy of RUL PO Belaruskali
2003 A. A. Tesovets
Studies of the operation of jet devices, centrifugal-vortex and screw pumps for pumping gas-liquid mixtures
2003 A. M. Kochergin, V. V. Kuryatnikov
Application of economic-mathematical methods in justifying the pricing policy of marble-mining enterprise (ZAO Koelgamramor)
2003 N. V. Gurova
Environmentally friendly technologies for disintegrating clay sands in the development of gold and platinum deposits
2003 A. V. Karepanov
Improving the quality of wellbore cementing by applying the technology of vibrating the entire length of the production string during the initial period of waiting for cement curing
2003 L. I. Garipova, R. A. Usmanov