New methodology for developing bituminous deposits
Authors:
About authors
- Almetyevsk Oil Institute
Abstract
The aim of the method is to create a method of effective displacement of bitumen and thereby increasing the extraction rate of bitumen through direct impact on the bitumen and its host sandstone, as well as by reducing the size of the extraction cell to the optimal size, which virtually eliminates uncontrolled output of directed heat flow through tectonic fractures, bypassing the bitumen layer in the extraction element. The method includes drilling of injection, drainage and production wells, injection of coolant through the injection wells, dewatering of the bitumen layer with the drainage well and extraction of bitumen through the production well.
Область исследования:
Geology
Funding:
None
Similar articles
Justification of the structural diagram of the automatic control system of oxygen-air mixture and natural gas supply to a suspended melting furnace
2003 I. V. Pyankin
Experimental determination of the contact thermal resistance of steel pipes with rolled and L-shaped wound aluminum alloy fins
2003 K. B. Semenido