Expansion of filter zones of hydrogeological and water wells
Authors:
About authors
- Moscow State Geological and Exploration University
Abstract
The problem of increasing the flow rate of wells by expanding the filter installation area is considered. Some existing constructions of reamers with the analysis of their advantages and disadvantages are given. A schematic diagram of a new reamer, developed at the Department of Exploration Drilling of MGRU, is given.
Similar articles
Representatives of the suborder ammonitina from stratotypic and reference sections of the Jurassic of England, France, and Germany
2003 D. V. Bezgodova
New Samolazovsky type of gold deposits in Central Aldan, features of processed ores, mineralization forecast
2003 V. A. Zelikov
Optimization of oil and petroleum product pumping regimes in pipelines with intermediate pump stations using variable speed pumps
2003 A. P. Tumanskii
Capillary forces as the main factor of oil displacement resistance in West Siberian fields
2003 E. Yu. Bolshakova