Submit an Article
Become a reviewer
Vol 156
Pages:
104-105
Download volume:
RUS
Article

Determination of the rational length of horizontal transport excavations of underground structures

Authors:
V. N. Makishin1
Yu. A. Zudikhin2
About authors
  • 1 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
  • 2 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
Date submitted:
2003-06-16
Date accepted:
2003-07-30
Date published:
2004-09-09

Abstract

The influence of natural conditions and design parameters of underground economic structures built in mountainous terrain on the length of their horizontal transport excavations has been studied. The method of determining the length of tunnels taking into account the terrain relief and the height of technological chambers is considered.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:

None

Go to volume 156

Similar articles

Rock structure and scale effect
2004 A. N. Stavrogin
On the influence of the construction technology of St. Petersburg metro stations on the process of shifting the earth's surface
2004 M. V. Dolgikh, E. M. Volokhov
On the problem of strict alignment of geodetic networks developed by a set of satellite navigation system stations
2004 A. V. Astapovich, M. Ya. Bryn, I. V. Koltsov, V. V. Sugako
Optimization of costs of a mining company in the context of operational management
2004 N. A. Reinik
Designing parameters of drilling fluids and flushing regimes during well drilling
2004 I. E. Dolgii
Evaluation of the influence of the blast pulse on the parameters of the blast funnel
2004 G. P. Zileev, A. G. Zileev