Submit an Article
Become a reviewer
Vol 156
Pages:
104-105
Download volume:
RUS
Article

Determination of the rational length of horizontal transport excavations of underground structures

Authors:
V. N. Makishin1
Yu. A. Zudikhin2
About authors
  • 1 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
  • 2 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
Date submitted:
2003-06-16
Date accepted:
2003-07-30
Date published:
2004-09-09

Abstract

The influence of natural conditions and design parameters of underground economic structures built in mountainous terrain on the length of their horizontal transport excavations has been studied. The method of determining the length of tunnels taking into account the terrain relief and the height of technological chambers is considered.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:

None

Go to volume 156

Similar articles

Designing parameters of drilling fluids and flushing regimes during well drilling
2004 I. E. Dolgii
Influence of the construction protective coating on the stress and strain state of the ore rock massif
2004 D. A. Potemkin
From the experience of creating a high-altitude separation network in the construction of out-of-grade bridges
2004 E. S. Bogomolova, O. N. Malkovskii
Geomechanical analysis of St. Petersburg bedrock clays as a fractured-block environment
2004 R. E. Dashko, A. V. Volkova
State regulation of environmentally safe use of land resources at the present stage
2004 V. A. Pavlova
On the evaluation of the reliability of geodetic constructions
2004 B. N. Dyakov