Submit an Article
Become a reviewer
Vol 156
Pages:
104-105
Download volume:
RUS
Article

Determination of the rational length of horizontal transport excavations of underground structures

Authors:
V. N. Makishin1
Yu. A. Zudikhin2
About authors
  • 1 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
  • 2 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
Date submitted:
2003-06-16
Date accepted:
2003-07-30
Date published:
2004-09-09

Abstract

The influence of natural conditions and design parameters of underground economic structures built in mountainous terrain on the length of their horizontal transport excavations has been studied. The method of determining the length of tunnels taking into account the terrain relief and the height of technological chambers is considered.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:

None

Go to volume 156

Similar articles

On the influence of the construction technology of St. Petersburg metro stations on the process of shifting the earth's surface
2004 M. V. Dolgikh, E. M. Volokhov
A study of the distortion of images taken with digital cameras
2004 K. N. Shkavera, Yu. N. Kornilov, A. S. Kirillova
Evaluation of the influence of the blast pulse on the parameters of the blast funnel
2004 G. P. Zileev, A. G. Zileev
Geomechanical substantiation of parameters for potash ore follow-up extraction from pillars using a drill auger excavation
2004 O. V. Kovalev, Yu. G. Sirenko, I. Yu. Tkhorikov, E. R. Kovalskii
Assessment of compliance of mining and backfill operations design parameters at Verkhnekamsk potash mines with mining and geological conditions from the perspective of geodynamic safety of the subsurface and the earth's surface
2004 S. A. Konstantinova, S. A. Chernopazov, V. E. Marakov
State regulation of environmentally safe use of land resources at the present stage
2004 V. A. Pavlova