Submit an Article
Become a reviewer
Vol 156
Pages:
104-105
Download volume:
RUS
Article

Determination of the rational length of horizontal transport excavations of underground structures

Authors:
V. N. Makishin1
Yu. A. Zudikhin2
About authors
  • 1 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
  • 2 — Far Eastern State Technical University (V.V.Kuibyshev DVPI)
Date submitted:
2003-06-16
Date accepted:
2003-07-30
Date published:
2004-09-09

Abstract

The influence of natural conditions and design parameters of underground economic structures built in mountainous terrain on the length of their horizontal transport excavations has been studied. The method of determining the length of tunnels taking into account the terrain relief and the height of technological chambers is considered.

Область исследования:
(Archived) Modern problems of geomechanics and geotechnology
Funding:

None

Go to volume 156

Similar articles

Mining of thick deposits within the boundaries of safety pillars with compacted filling of the mined-out space
2004 Kh. I. Aglyukov, A. E. Udalov, S. N. Zelentsov
Surveying work on the construction of the cable-stayed bridge over the Neva River in St. Petersburg
2004 O. P. Sergeev
Geomechanical justification of rock mass model for the analysis of the limit state of pillars
2004 A. P. Gospodarikov, S. E. Mansurova, A. V. Montikov
A study of the distortion of images taken with digital cameras
2004 K. N. Shkavera, Yu. N. Kornilov, A. S. Kirillova
Principle scheme for obtaining displacements and deformations of layers of the undermined strata with an undetermined mineral extraction line
2004 V. N. Gusev, V. N. Monakhov, V. V. Guryanov
Development of St. Petersburg subway tunnel lining stress-strain state during operation
2004 M. O. Lebedev