Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
70-72
Download volume:
RUS
Article

Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh

Authors:
A. S. Semenov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-26
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The technical and economic assessment of the development of open pits to replenish the raw material base of Karelsky Okatysh OJSC is presented. The calculation of economic risk and assessment of the feasibility of deposit development are carried out.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed
2004 I. A. Ishkulova
Study of mixing processes in apparatuses with stirrers
2004 A. A. Markelov
Peculiarities of bauxite reserves calculation at one of the Vezha-Vorykvinsky deposit sites
2004 A. V. Kostyakhina
Economic efficiency of company diversification
2004 A. M. Ivanov
Overview of foreign forecasts for the development of Russia's oil and gas potential
2004 P. A. Khantaev
Improvement of nepheline speck leaching technology based on the use of combined coagulants-flocculants of the carboaluminate-alklar type
2004 S. A. Vinogradov