Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
70-72
Download volume:
RUS
Article

Justification of investments in quarry construction to replenish the raw material base of OAO Karelsky Okatysh

Authors:
A. S. Semenov
About authors
  • Research assistant G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-26
Date accepted:
2003-07-09
Date published:
2004-12-21

Abstract

The technical and economic assessment of the development of open pits to replenish the raw material base of Karelsky Okatysh OJSC is presented. The calculation of economic risk and assessment of the feasibility of deposit development are carried out.

Область исследования:
(Archived) Development of mineral deposits
Go to volume 159

Similar articles

Simulation of steady state operation of the air duct section
2004 P. S. Zavertkin
Regularities of stress and rock displacement distribution in the contour zone for layered massifs
2004 D. I. Raevskii
Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed
2004 I. A. Ishkulova
Using fractal analysis to characterize the structure of the Alexandrinskoye ore deposit (Southern Urals)
2004 D. A. Petrov
Ways to improve the competitiveness of Russian coal companies
2004 O. Yu. Lebedeva
Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes
2004 M. R. Saitgareev